What we deliver
-
Works to CAA and airfield-operator specifications, with appropriate airside permits and escorts.
-
Lifts completed within scheduled night closures, apron back in service before first movement.
-
Resin engineered for aircraft wheel and tug loading.
-
Stops sub-base migration caused by jet blast and surface water ingress.
How it compares
Resin injection alongside the realistic alternatives you might be quoted for this job.
CAA CAP 168
Surface regularity per pavement type and aircraft loading classification
Polyurethane resin injection
Recommended- Out of service
- Within maintenance window
- Traffic mgmt
- Required
- Invasiveness
- Low
- Addresses void
- Yes
- Longevity
- 25+ years
- Relative cost
- Baseline
Full panel replacement
- Out of service
- 4–8 weeks per panel
- Traffic mgmt
- Required
- Invasiveness
- High
- Addresses void
- Yes
- Longevity
- 25–40 years
- Relative cost
- Much higher
Cement pressure grouting
- Out of service
- 3–7 days
- Traffic mgmt
- Required
- Invasiveness
- Medium
- Addresses void
- Yes
- Longevity
- 10–20 years
- Relative cost
- Similar
Dowel bar retrofit
- Out of service
- 1–3 weeks
- Traffic mgmt
- Required
- Invasiveness
- High
- Addresses void
- No
- Longevity
- 15–25 years
- Relative cost
- Higher
Why this method works
Proven across hundreds of civil sites.
Short possession windows
Lifts completed within night possessions and short road closures, back in service before peak traffic.
Designed to specification
Schemes engineered to your spec, DMRB, Network Rail, CAA, with resin grade, density and lift profile signed off.
Permanent void filling
Resin penetrates and seals voids in the sub-base, stopping further migration and washout for good.
Lower carbon than replacement
A fraction of the embodied carbon of full slab replacement, and no landfill of broken concrete.
Worried about airport & runway subsidence?
Send us the site details and we'll come back with a free, written quote.
Free Quote →Frequently asked questions