UK motorway with traffic on concrete carriageway

Home · Services · Civil · Roads

Civil sector

Road Subsidence

Re-levelling for Road, Carriageway & Slab Subsidence Repair

Stabilise and re-level settled concrete carriageway slabs in single night possessions, avoiding full slab replacement.

What we deliver

  • Designed to DMRB specification with calculations issued for asset-owner approval.

  • Re-support and re-level in one operation, no separate grout injection step.

  • Carriageway back in service before the morning peak.

  • Significantly lower embodied carbon than full slab replacement, with no landfill of broken concrete.

How it compares

Resin injection alongside the realistic alternatives you might be quoted for this job.

DMRB / Specification for Highway Works (SHW)

Riding quality and surface regularity per scheme classification

Polyurethane resin injection

Recommended
Out of service
Within maintenance window
Traffic mgmt
Required
Invasiveness
Low
Addresses void
Yes
Longevity
25+ years
Relative cost
Baseline

Full slab reconstruction

Out of service
6–12 weeks
Traffic mgmt
Required
Invasiveness
High
Addresses void
Yes
Longevity
25–40 years
Relative cost
Much higher

Asphalt overlay

Out of service
1–2 days
Traffic mgmt
Required
Invasiveness
Medium
Addresses void
No
Longevity
8–15 years
Relative cost
Higher

Cold-mix patching

Out of service
Hours
Traffic mgmt
Required
Invasiveness
Low
Addresses void
No
Longevity
2–4 years
Relative cost
Lower

Why this method works

Proven across hundreds of civil sites.

Short possession windows

Lifts completed within night possessions and short road closures, back in service before peak traffic.

Designed to specification

Schemes engineered to your spec, DMRB, Network Rail, CAA, with resin grade, density and lift profile signed off.

Permanent void filling

Resin penetrates and seals voids in the sub-base, stopping further migration and washout for good.

Lower carbon than replacement

A fraction of the embodied carbon of full slab replacement, and no landfill of broken concrete.

Worried about road subsidence?

Send us the site details and we'll come back with a free, written quote.

Free Quote

Frequently asked questions

Yes, civil resin injection schemes are designed to DMRB, Network Rail and local authority specifications, with PTS-certified operatives on rail possessions where required.

Ready to lift your sunken concrete?

Get a free, no-obligation quote from a vetted UK specialist.

Free Quote