What we deliver
-
Eliminates the 'bump' at the bridge joint that damages vehicles and accelerates deck deterioration.
-
Designed and signed off to DMRB and asset-owner specification.
-
Single night possession typically sufficient for an approach transition.
-
Permanent void-fill of the embankment sub-base stops further differential settlement.
How it compares
Resin injection alongside the realistic alternatives you might be quoted for this job.
Polyurethane resin injection
Recommended- Out of service
- Within maintenance window
- Traffic mgmt
- Required
- Invasiveness
- Low
- Addresses void
- Yes
- Longevity
- 25+ years
- Relative cost
- Baseline
Full reconstruction
- Out of service
- 8–16 weeks
- Traffic mgmt
- Required
- Invasiveness
- High
- Addresses void
- Yes
- Longevity
- 25–40 years
- Relative cost
- Much higher
Cement grouting
- Out of service
- 5–10 days
- Traffic mgmt
- Required
- Invasiveness
- Medium
- Addresses void
- Yes
- Longevity
- 10–20 years
- Relative cost
- Similar
Cold-mix patching
- Out of service
- Hours
- Traffic mgmt
- Required
- Invasiveness
- Low
- Addresses void
- No
- Longevity
- 2–4 years
- Relative cost
- Lower
Why this method works
Proven across hundreds of civil sites.
Short possession windows
Lifts completed within night possessions and short road closures, back in service before peak traffic.
Designed to specification
Schemes engineered to your spec, DMRB, Network Rail, CAA, with resin grade, density and lift profile signed off.
Permanent void filling
Resin penetrates and seals voids in the sub-base, stopping further migration and washout for good.
Lower carbon than replacement
A fraction of the embodied carbon of full slab replacement, and no landfill of broken concrete.
Worried about bridge subsidence?
Send us the site details and we'll come back with a free, written quote.