What we deliver
-
Eliminates the strip of stepped settlement along trench lines.
-
Permanent void-fill of the trench fill stops further consolidation.
-
Completed inside a standard road closure, no excavation required.
-
Designed to SROH and HAUC reinstatement standards.
How it compares
Resin injection alongside the realistic alternatives you might be quoted for this job.
NRSWA / Reinstatement Code of Practice
Permanent reinstatement to match surrounding surface category
Polyurethane resin injection
Recommended- Out of service
- Hours–1 day
- Traffic mgmt
- Required
- Invasiveness
- Low
- Addresses void
- Yes
- Longevity
- 25+ years
- Relative cost
- Baseline
Full excavation and relay
- Out of service
- 1–2 weeks
- Traffic mgmt
- Required
- Invasiveness
- High
- Addresses void
- Yes
- Longevity
- 25–40 years
- Relative cost
- Higher
Concrete reinstatement
- Out of service
- 3–7 days
- Traffic mgmt
- Required
- Invasiveness
- Medium
- Addresses void
- Yes
- Longevity
- 15–25 years
- Relative cost
- Similar
Cold-mix patching
- Out of service
- Hours
- Traffic mgmt
- Required
- Invasiveness
- Low
- Addresses void
- No
- Longevity
- 2–4 years
- Relative cost
- Lower
Why this method works
Proven across hundreds of civil sites.
Short possession windows
Lifts completed within night possessions and short road closures, back in service before peak traffic.
Designed to specification
Schemes engineered to your spec, DMRB, Network Rail, CAA, with resin grade, density and lift profile signed off.
Permanent void filling
Resin penetrates and seals voids in the sub-base, stopping further migration and washout for good.
Lower carbon than replacement
A fraction of the embodied carbon of full slab replacement, and no landfill of broken concrete.
Worried about utilities subsidence?
Send us the site details and we'll come back with a free, written quote.