Garden patio with vintage white cast-iron table and chairs set on uneven stone paving surrounded by greenery

Home · Services · Residential · Patios & Paths

Residential sector

Patio & Pathway Subsidence

Re-levelling for Patio, Pathway & Paving Subsidence Repair

Lift sunken patios, pathways and garden paving back to level without removing the existing slabs.

What we deliver

  • Single-visit lifts, patio back in use the same day.

  • No need to lift and re-bed existing flags or paving.

  • Restores correct falls so water drains off the patio instead of pooling.

  • Permanent fix, resin bonds the sub-base into a stable platform.

How it compares

Resin injection alongside the realistic alternatives you might be quoted for this job.

Polyurethane resin injection

Recommended
Out of service
2–4 hours
Traffic mgmt
Not required
Invasiveness
Low
Addresses void
Yes
Longevity
25+ years
Relative cost
Baseline

Full dig-out and relay

Out of service
5–10 days
Traffic mgmt
Not required
Invasiveness
High
Addresses void
Yes
Longevity
20–30 years
Relative cost
Much higher

Block paving reset

Out of service
1–2 days
Traffic mgmt
Not required
Invasiveness
Low
Addresses void
No
Longevity
4–8 years
Relative cost
Lower

Self-levelling screed

Out of service
48–72 hours
Traffic mgmt
Not required
Invasiveness
Medium
Addresses void
No
Longevity
5–10 years
Relative cost
Similar

Why this method works

Proven across hundreds of residential sites.

Done in hours

Most domestic jobs are completed in a single visit and ready to walk or drive on the same day.

Far cheaper than replacement

Typically 50–70% less than tearing out the slab and pouring fresh concrete.

Tiny holes, no mess

Injection holes are smaller than a 5p coin and patched flush when the work is finished.

Permanent stabilisation

Resin fills voids in the sub-base and bonds the slab to a stable platform, settlement stops for good.

Worried about patio & pathway subsidence?

Send us the site details and we'll come back with a free, written quote.

Free Quote

Frequently asked questions

Most driveway, garage floor and patio resin injection jobs are lifted in a few hours. You can usually walk on the slab the same day and drive on the re-levelled driveway shortly after.

Ready to lift your sunken concrete?

Get a free, no-obligation quote from a vetted UK specialist.

Free Quote